New ashram / Construction diary

Construction diary

Reports from the building of the ashram in Tłuczań, the renovation of the old building, the garden and seva. Newest entries first, with dates and photos.

2023
Purchase of the plot
Aug 2024
Inauguration of the centre
2025
Renovation of the old building, garden
2026
Foundations and walls of the building
Later
Furnishing and opening
Sort: newest
Roof and gutters nearly done, time for work around the building
October 2026 · New ashram · PL / EN / DE

Roof and gutters nearly done, time for work around the building

The work is going according to schedule and the weather is on the roofers' side. Metal roof tiles already cover most of the roof, and soon we will move on to tidying up the ground around the building.

Read the entry
Closing the building before winter
October 2026 · New ashram · PL / EN / DE

Closing the building before winter

The main building already has its roof boarding, and the metal roof tiles are being laid on part of the roof. We are closing the structure from above before winter.

The kitchen is finished
[date] · Old building · PL / EN / DE

The kitchen is finished

A cabinet made to order by a joiner completed the look and the function of the kitchen in the old building.

The walls of the main building are rising
July 2026 · New ashram · PL / EN / DE

The walls of the main building are rising

Walls of ceramic blocks are rising on the foundations. The main building is beginning to take shape.

Foundations of the main building
May 2026 · New ashram · PL / EN / DE

Foundations of the main building

In May the foundations of the main building were laid on the plot in Tłuczań. Excavations, reinforcement and the first concrete footings marked out the outline of the future ashram.

Tanks, a lawn mower and a pergola in the garden
[date] · Garden · PL / EN / DE

Tanks, a lawn mower and a pergola in the garden

Two 1000 l tanks, a pergola and a petrol lawn mower bought thanks to the generosity of one of the kriyavans. A large plot needs constant care.

The garden in high summer
[date] · Garden · PL / EN / DE

The garden in high summer

Black-eyed Susans, coneflowers and lavender in full bloom. In high summer the garden by the old building is filled with colour, fragrance and the buzzing of insects.

The renovated bathroom
[date] · Old building · PL / EN / DE

The renovated bathroom

The new bathroom is finished and fully functional. We removed the bathtub and installed a shower cabin.

3 steps to turn a kitchen into a bedroom
[date] · Old building · PL / EN / DE

3 steps to turn a kitchen into a bedroom

See how the old kitchen became a guest bedroom. The new kitchen is at the back of the building.

Seva and new plants in the garden
17.05.2025 · Meetings and seva · PL / EN / DE

Seva and new plants in the garden

A fantastic group of kriyavans took care of the garden and the new flowers.

Demolition of the old buildings and preparing the site
June 2024 · New ashram · PL / EN / DE

Demolition of the old buildings and preparing the site

The old barn and garages, no longer fit for use, were pulled down. The concrete slab was removed and the site was prepared for surveying and excavation.

Support the construction
Every entry is the result of work and donations