Before the foundations could be laid, the plot had to be cleared. The old barn and garages, which were no longer fit for use, were pulled down.
After the demolition the concrete slab had to be removed. The site was cleaned up and prepared for the land survey and measuring work, and then for the excavations.
Below are videos of the demolition and of the further earthworks, and photos of the site after the demolition.